SOP for Testing of Earth Pits : Pharmaceutical Guidelines

SOP for Testing of Earth Pits

Standard operating procedure to test the earth pits.

1.0 OBJECTIVE:

      To lay down procedure for testing of earth pits.

2.0 SCOPE:

      This SOP shall be applicable for all earth pits.

3.0 RESPONSIBILITY:

      Officer / Executive

4.0 ACCOUNTABILITY:

      HOD engineering

5.0 PROCEDURE: 

5.1 Get all the earth pits, tested through approved licensed electrical contractor.
5.2 Ensure that all readings of the tested earths pits are entered and signed by approved licensed electrical contractor.
5.3 Add salt and water if reading exceeds 2 Ω.
5.4 Frequency of testing earth pits is once in a year.

6.0 ABBREVIATION:

6.1 SOP : Standard Operating Procedure



Ankur Choudhary is India's first professional pharmaceutical blogger, author and founder of Pharmaceutical Guidelines, a widely-read pharmaceutical blog since 2008. Sign-up for the free email updates for your daily dose of pharmaceutical tips.
.moc.enilediugamrahp@ofni :liamENeed Help: Ask Question


Click Here

No comments:

Post a Comment

CURRENT JOBS

Show All ❭❭Jobs by PharmaJobs

Write a Powerful CV

Click Here

Advertise Here

Get App for News Updates

Scan to Download

Android App
Android App
You are not authorized to view this section.