    SOP for Operation after M.S.E.B. Power Failure

    Standard operating procedure to operate the system after M.S.E.B. Power Failure.

    1.0 OBJECTIVE

    To lay down the procedure for operation after M.S.E.B. power failure.

    2.0 SCOPE

    This SOP shall be applicable for electrical power system of the plant.

    3.0 RESPONSIBILITY

    Technician/ Engineer/ Executive

    4.0 ACCOUNTABILITY

    Head of Department

    5.0 PROCEDURE

    5.1 APFC panel in Utility block will switch off automatically.
    5.2 Ensure that air circuit breakers of transformer 1 and 2 are tripped.

    5.3 For Auto changeover

    5.3.1 D.G. set will start automatically after a power failure.
    5.3.2 Check voltages between R-Y, Y-B and B-R, it should be between 415 to 420 volts.
    5.3.3 Check frequency of supply it should be between 49.5 to 50.0 Hz.
    5.3.4 Close the D.G. incomer breaker and breakers of bus coupler 1 and 2 manually by releasing the emergency switch and turning the selector switch to auto mode.

    5.4 For manual changeover

    5.4.1 Start the D.G. set as per the procedure for operation of D.G. set.
    5.4.2 Check voltages between R-Y, Y-B and B-R, it should be between 415 to 420 volts.
    5.4.3 Check frequency of supply it should be between 49.5 to 50.0 Hz.
    5.4.4 Close the D.G. incomer breaker in D.G. room.
    5.4.5 Ensure transformer incomer – 1 and transformer incomer – 2 on L. T. panel must be in open condition.
    5.4.6 Close the breaker of D.G. incomer, bus coupler –1 and bus coupler -2 on L. T. panel.
    5.4.7 The load in Amps on D.G. set now starts increasing, monitor it.
    5.5 If load exceeds 850Amps, start additional D.G. set manually which gets synchronized with other D.G. set.

    5.6 The load on D.G. sets will be shared equally.
    5.7 Monitor and record parameters in D.G. set monitoring record.
    5.8 After resumption of D.G. power, ensure utility PMCC, PCC-MFG, Sub PCC 1 & 2 and MLDB are operational.
    Related: SOP for Operation after M.S.E.B. Power Resumption

    6.0 ABBREVIATION

    6.1 SOP: Standard Operating Procedure
    Get editable documentsView List

    No comments:

    Post a Comment

    Please don't spam. Comments having links would not be published.


    Popular Categories ๐Ÿท️

    QA SOPs QC SOPs Micro SOPs HVAC Production SOPs Stores SOPs Checklists Maintenance SOPs HPLC Sterile GLP Validation Protocols Water System GDP Regulatory Maintenance Calibration Warning Letters Education B.Pharmacy
    Online Courses Salary Calculator
    Follow on Whatsapp


    Certificate Courses ๐ŸŽ–️

    Pharmaceutical Courses

    Follow Pharmaguideline


    DOCUMENTS ๐Ÿ“‹

    PHARMACEUTICAL DOCUMENTS




    Editable Pharmaceutical Documents in MS-Word Format. Ready to use SOPs, Protocols, Master Plans, Manuals and more...

    View


    adsbypg


    GET APP FOR NEWS UPDATES


    Android App