SOP for Testing of Earth Pits | Pharmaguideline
  •   Pharmaguideline Courses Start Learning
  • Apr 17, 2021

    SOP for Testing of Earth Pits

    Standard operating procedure to test the earth pits.

    1.0 OBJECTIVE

    To lay down the procedure for testing of earth pits.

    2.0 SCOPE

    This SOP shall be applicable for all earth pits.

    3.0 RESPONSIBILITY

    Officer/ Executive

    4.0 ACCOUNTABILITY

    HOD engineering

    5.0 PROCEDURE

    5.1 Get all the earth pits, tested through an approved licensed electrical contractor.
    5.2 Ensure that all readings of the tested earth pits are entered and signed by the approved licensed electrical contractor.
    5.3 Add salt and water if reading exceeds 2 Ω.
    5.4 Frequency of testing earth pits is once a year.

    6.0 ABBREVIATION

    6.1 SOP: Standard Operating Procedure
    Get editable documentsView List

    No comments:

    Post a Comment

    Please don't spam. Comments having links would not be published.


    Popular Categories 🏷️

    QA SOPs QC SOPs Micro SOPs HVAC Production SOPs Stores SOPs Checklists Maintenance SOPs HPLC Sterile GLP Validation Protocols Water System GDP Regulatory Maintenance Calibration Warning Letters Education B.Pharmacy
    Online Courses Salary Calculator
    Follow on Whatsapp


    Certificate Courses 🎖️

    Pharmaceutical Courses

    Follow Pharmaguideline


    DOCUMENTS 📋

    PHARMACEUTICAL DOCUMENTS




    Editable Pharmaceutical Documents in MS-Word Format. Ready to use SOPs, Protocols, Master Plans, Manuals and more...

    View


    adsbypg


    GET APP FOR NEWS UPDATES


    Android App