SOP for Breakdown Maintenance of Equipment, Machinery and Facility | Pharmaguideline
  •   Pharmaguideline Courses Start Learning
  • Apr 17, 2021

    SOP for Breakdown Maintenance of Equipment, Machinery and Facility

    Standard operating procedure of break down maintenance of equipment in different pharmaceutical departments and record information in machine history card.

    1.0 OBJECTIVE

    To lay down the procedure for breakdown maintenance.

    2.0 SCOPE

    This SOP shall be applicable for equipment, machinery and facility breakdown.

    3.0 RESPONSIBILITY

    Operator/Technician/Officer/Executive

    4.0 ACCOUNTABILITY

    Head of Engineering

    5.0 PROCEDURE

    5.1 Communicate the breakdown to the engineering department and handover the breakdown intimation note.
    5.2 Officer/ executive- engineering will depute the technician to attend the breakdown.
    5.3 While carrying out the breakdown maintenance, ensure that following steps are taken:
    5.3.1 Switch off the power supply of the machine and put a board on machine stating “UNDER MAINTENANCE”.
    5.3.2 Discuss the incidence of breakdown with the operator to understand the details.
    5.3.3 Carefully inspect the machine and check the cause of the breakdown.
    5.3.4 After identifying the cause, if any parts/ assemblies of the machine are to be dismantled, mark them properly for identification.
    5.3.5 Keep the dismantled parts of the machine in the proper tray and clean them thoroughly.
    5.3.6 After the repairs, assemble the parts, check the assemblies for smooth operations and then assemble them on the machine.
    5.3.7 Lubricate the parts wherever lubrication is required, as per the lubricant recommended by the machine manufacturer/ supplier.
    5.3.8 After satisfactory repairs of breakdown, show the performance trial to the concerned person and get it confirmed in breakdown intimation note.
    5.3.9 Remove the “UNDER MAINTENANCE” board.

    5.4 Record this information in the machine history card.
    5.5 In case of any major part to be replaced, which may affect the machine performance should take place through a change control procedure.
    5.6 Maintenance work required other than the breakdown of process related equipment / instruments shall be communicated through maintenance requisition.
    Related: SOP for Intimation of Breakdown of Utilities Services & Equipments in Manufacturing & Packing Department During Working

    6.0 ABBREVIATION

    6.1 SOP: Standard Operating Procedure
    Get editable documentsView List

    No comments:

    Post a Comment

    Please don't spam. Comments having links would not be published.


    Popular Categories ๐Ÿท️

    QA SOPs QC SOPs Micro SOPs HVAC Production SOPs Stores SOPs Checklists Maintenance SOPs HPLC Sterile GLP Validation Protocols Water System GDP Regulatory Maintenance Calibration Warning Letters Education B.Pharmacy
    Online Courses Salary Calculator
    Follow on Whatsapp


    Certificate Courses ๐ŸŽ–️

    Pharmaceutical Courses

    Follow Pharmaguideline


    DOCUMENTS ๐Ÿ“‹

    PHARMACEUTICAL DOCUMENTS




    Editable Pharmaceutical Documents in MS-Word Format. Ready to use SOPs, Protocols, Master Plans, Manuals and more...

    View


    adsbypg


    GET APP FOR NEWS UPDATES


    Android App