SOP for Testing of Earth Pits

Standard operating procedure to test the earth pits.

1.0 OBJECTIVE

To lay down the procedure for testing of earth pits.

2.0 SCOPE

This SOP shall be applicable for all earth pits.

3.0 RESPONSIBILITY

Officer/ Executive

4.0 ACCOUNTABILITY

HOD engineering

5.0 PROCEDURE

5.1 Get all the earth pits, tested through an approved licensed electrical contractor.
5.2 Ensure that all readings of the tested earth pits are entered and signed by the approved licensed electrical contractor.
5.3 Add salt and water if reading exceeds 2 Ω.
5.4 Frequency of testing earth pits is once a year.

6.0 ABBREVIATION

6.1 SOP: Standard Operating Procedure
Get ready to use editable SOPs in MS-Word FormatView List





is a prominent Pharmaceutical Quality Assurance expert, consultant and the founder of Pharmaguideline. With over 22 years of hands-on experience in cGMP-compliant manufacturing environments, he specializes in establishing validation protocols, sterile area controls and data integrity systems. Ankur routinely interprets international regulatory frameworks (including FDA, EMA and ICH guidelines) to help global pharmaceutical professionals ensure strict regulatory compliance and operational excellence. Connect with Ankur on LinkedIn. Need Help: Ask Question

No comments:

Post a Comment

Please don't spam. Comments having links would not be published.