SOP for Retesting Schedule of Packaging Material | Pharmaguideline
  •   Pharmaguideline Courses Start Learning
  • Apr 17, 2021

    SOP for Retesting Schedule of Packaging Material

    Standard operating procedure to schedule the retesting of the Packaging Material.

    1.0 OBJECTIVE

    To ensure compliance with the specification for approved primary packaging material at regular interval during storage.

    2.0 SCOPE

    This procedure is applicable for approved primary packaging material, lying in the Packaging Material store.

    3.0 RESPONSIBILITY

    3.1 Doing: Technical Assistant/Executive
    3.2 Checking: Executive /Manager

    4.0 ACCOUNTABILITY

    Head of the Department

    5.0 PROCEDURE

    5.1 Generate a Retesting List through SAP System with Inspection lot origin 09 in QA33 as per Listed Annexur-I.
    5.2 As per retesting list respective P.M. status will be changed from Unrestricted to Quality inspection stock through SAP System.
    5.3 Sample the material for retesting as per the list generated by the system and verify origin against their record.
    5.4 Affix blue color “UNDER RETEST” label on each Box and Rolls having following details and cross out “Approved” label with the marker on all boxes.
    Name of Material:
    A.R. No.:
    Sample By:            Date:
    5.5 Carry out the testing as per the test mentioned in the following table for respective packaging materials.

    Sr. No.
    Packaging material
    Test
    01
    Aluminium Foils
    Description, Pin holes, size and thickness
    02
    Vials and Ampoules
    Description, chemical resistance(powdered glass test)
    03
    Plastic caps (Nikoran tab)
    Description, Loss on drying of silica
    04
    PVC/PVDC foil
    Description, size and thickness
    05
    Rubber stopper
    Description, pH of aqueous solution, biological test
    06
    Silica bag
    Description, loss on drying
    Note: Check the Physical description of all materials during retesting

    5.6 Prepare Retest report, Record results in SAP System & get it signed by Quality Control Incharge.
    5.7 On completion of testing the Q.C. Incharge will change the status of material in SAP System.
    1. Accepted. 3. Part Qty. Rejected.
    2. Rejected. 4. Fails.
    5.8 Keep the record of retesting in a separate file.
    5.9 On approval of material affix “APPROVED” label with the new retesting date on respective Boxes and Rolls.
    5.10 If the material is rejected, affix “REJECTED” label on respective Boxes and Rolls.

    Related: SOP for Handling of Rejected Packing Materials

    6.0 ABBREVIATIONS

    6.1 PVC = Poly vinyl chloride
    6.2 PVDC = Polyvinlidene chloride
    6.3 A.R. No = Analytical Report Number

    Annexure-I 
    PACKAGING MATERIAL RETESTING SCHEDULE
    SR.NO.
    NAME OF MATERIAL
    RETESTING  PERIOD
    01
    Plain foil
    1 year
    02
    Printed foil
    1 year
    03
    PVC film
    1 year
    04
    PVDC film
    1 year
    05
    Vials
    1 year
    06
    Ampoules
    1 year
    07
    Plastic caps
    6 month
    08
    Rubber stopper
    1 year
    09
    Silica bag
    6 month
    Get editable documentsView List

    No comments:

    Post a Comment

    Please don't spam. Comments having links would not be published.


    Popular Categories ๐Ÿท️

    QA SOPs QC SOPs Micro SOPs HVAC Production SOPs Stores SOPs Checklists Maintenance SOPs HPLC Sterile GLP Validation Protocols Water System GDP Regulatory Maintenance Calibration Warning Letters Education B.Pharmacy Regulatory Updates
    Online Courses Salary Calculator
    Follow on Whatsapp


    Certificate Courses ๐ŸŽ–️

    Pharmaceutical Courses

    Follow Pharmaguideline


    DOCUMENTS ๐Ÿ“‹

    PHARMACEUTICAL DOCUMENTS




    Editable Pharmaceutical Documents in MS-Word Format. Ready to use SOPs, Protocols, Master Plans, Manuals and more...

    View


    adsbypg


    GET APP FOR NEWS UPDATES


    Android App