SOP for Sterile Dress Cabinet

Standard operating procedure for sterile dress cabinet having UV lights.

1.0 Objective

To lay down the operating procedure for sterile dress cabinet

2.0 Scope

To ensure the sterility of garment stored in sterile dress cabinet.

3.0 Responsibility

3.1 Doing: Tech.Assistant/Executive
3.2 Checking: Executive/Manager

4.0 Accountability

Head of the Department

5.0 Procedure

5.1 Connect the Instrument in mains.
5.2 Switch ‘ON’ the mains.
5.3 Hang the sterile garments inside it.
5.4 ‘ON’ the IR LAMP to dry the garments if required.
5.5 ‘ON’ the Airflow.
5.6 Shut the door properly.
5.7 Take out garment whenever required.
5.8 Take out garment whenever required.
5.9 After completion of work take out garments.
5.10 Note down the pressure reading from Magnahelic manometer gauge provided on the cabinet in Annexure-I.
5.11 Switch ‘OFF’ the Airflow.
5.12 Switch ‘ON’ the U.V. light.
5.13 Keep the UV Burning hrs record in Annexure-I from UV Burning hour meter provided on dress cabinet.

6.0 Abbreviations

Nil

ANNEXURE-I

MICROBIOLOGY DEPARTMENT
S.O.P.No.: ____________
RECORDS OF STERILE DRESS CABINET
MONTH :_____________________

DATE
MANOMETER
READING (mm of water)
UV Burning (in hours)
Remarks Sign
































Get ready to use editable SOPs in MS-Word FormatView List





is a prominent Pharmaceutical Quality Assurance expert, consultant and the founder of Pharmaguideline. With over 22 years of hands-on experience in cGMP-compliant manufacturing environments, he specializes in establishing validation protocols, sterile area controls and data integrity systems. Ankur routinely interprets international regulatory frameworks (including FDA, EMA and ICH guidelines) to help global pharmaceutical professionals ensure strict regulatory compliance and operational excellence. Connect with Ankur on LinkedIn. Need Help: Ask Question

No comments:

Post a Comment

Please don't spam. Comments having links would not be published.