Get the latest updates from us for free
Android App

SOP for Operation of Forced Draft Ventilation (FDV) and Forced Exhaust (FE) Unit


Standard operating procedure to operate the forced draft ventilation and forced exhaust unit in the case of failure in BMS system.

1.0 OBJECTIVE:

      To lay down procedure for operation of forced draft ventilation (FDV) & forced exhaust (FE) unit.

2.0 SCOPE:

      This SOP shall be applicable for all forced draft ventilation & forced exhaust unit in case of failure in BMS system.

3.0 RESPONSIBILITY:

      Technician / Engineer/ Executive

4.0 ACCOUNTABILITY:

      HOD Engineering

5.0 PROCEDURE: 

5.1 For starting forced draft ventilation & forced exhaust units
5.1.1 Keep the selector switch at "HAND" position on the feeder.
5.1.2 Ensure emergency switch on the feeder is in released condition.
5.1.3 Start forced draft ventilation & forced exhaust unit by pressing red "ON" push button on the feeder.
5.2 For stopping forced draft ventilation & forced exhaust units
5.2.1 Stop Forced Draft Ventilation & Forced Exhaust Unit by turning the selector switch to center position.
5.3 Maintain record of FDV/FE unit ON and OFF time in daily record for forced draft ventilation & forced exhaust unit.

6.0 ABBREVIATION:

6.1 SOP : Standard Operating Procedure
Ankur Choudhary is India's first professional pharmaceutical blogger, author and founder of Pharmaceutical Guidelines, a widely-read pharmaceutical blog since 2008. Sign-up for the free email updates for your daily dose of pharmaceutical tips.
Email: .moc.enilediugamrahp@ofni Need Help: Ask Question


Be the first to comment!

Post a Comment