SOP for Operation of Forced Draft Ventilation (FDV) and Forced Exhaust (FE) Unit : Pharmaceutical Guidelines

SOP for Operation of Forced Draft Ventilation (FDV) and Forced Exhaust (FE) Unit

Standard operating procedure to operate the forced draft ventilation and forced exhaust unit in the case of failure in BMS system.

1.0 OBJECTIVE

To lay down the procedure for operation of forced draft ventilation (FDV) & forced exhaust (FE) unit.

2.0 SCOPE

This SOP shall be applicable for all forced draft ventilation & forced exhaust unit in case of failure in BMS system.

3.0 RESPONSIBILITY

Technician/ Engineer/ Executive

4.0 ACCOUNTABILITY

HOD Engineering

5.0 PROCEDURE

5.1 For starting forced draft ventilation & forced exhaust units
5.1.1 Keep the selector switch at "HAND" position on the feeder.
5.1.2 Ensure emergency switch on the feeder is in the released condition.
5.1.3 Start forced draft ventilation & forced exhaust unit by pressing red "ON" push button on the feeder.
5.2 For stopping forced draft ventilation & forced exhaust units
5.2.1 Stop Forced Draft Ventilation & Forced Exhaust Unit by turning the selector switch to center position.
5.3 Maintain the record of FDV/FE unit ON and OFF time in the daily record for forced draft ventilation & forced exhaust unit.

6.0 ABBREVIATION

6.1 SOP: Standard Operating Procedure





Ankur Choudhary is India's first professional pharmaceutical blogger, author and founder of Pharmaceutical Guidelines, a widely-read pharmaceutical blog since 2008. Sign-up for the free email updates for your daily dose of pharmaceutical tips.
.moc.enilediugamrahp@ofni :liamENeed Help: Ask Question


Click Here

No comments: Read Comment Policy ▼

Post a Comment


Follow Pharmaguideline


CURRENT JOBS

Show All ❭❭Jobs by PharmaJobs

WRITE A POWERFUL CV

Click Here



ADVERTISE HERE


GET APP FOR NEWS UPDATES

Scan to Download

Android App
Android App

Recent Posts