Scale Up, Post Approval Changes (SUPAC guidelines)

SUPAC is scale-up and the post-approval changes like in the formulation of the drug, batch size, process, equipment, site of manufacturing.
Scale-up is an integral part of any life cycle of a product and in the process, it required a “detail-oriented” and “perfectionist” approach to be followed to ensure that the end outcome is identical to the original product formulation. Scale-up can be understood as the increase in production output as technology transfer takes place from lab-scale research to the giant production output.

The initiation of approval of any generic drug begins with the application filing of ANDA (Abbreviated New Drug Application). But there is a twist as the manufacturer may change the formulation of the drug, batch size, process, equipment, site of manufacturing which directs to change in identity, strength, quality and potency of the product.

What is SUPAC?
SUPAC is scale-up and the post-approval changes (changes that are made after approval) like in the formulation of the drug, batch size, process, equipment, site of manufacturing.

SUPAC documents or guidance are as below:
FDA issues list of documents to help applicants with post-approval changes:
Documents are divided into IR (immediate-release), MR (modified release), SS (non-sterile semisolid dosage form).

In the following areas, changes are likely to take place:
  1. Components and composition of the drug product
  2. Manufacturing site change
  3. Scale-up of the drug product
  4. Manufacturing equipment
  5. Packaging
Mainly describes 3 levels of changes which include chemistry, manufacturing and controls tests, in vitro dissolution tests, and bioequivalence tests for each level.

Level Definition
1- Changes that are unlikely to have any detectable impact on formulation quality and performance
2- Changes that could have a significant impact on formulation quality and performance
3- Changes that are likely to have a significant impact on formulation quality and performance

Current requirements for post-approval changes:
  1. Components/ Composition
  2. Site changes
  3. Change in batch size
  4. Manufacturing
  5. Specifications
  6. Packaging
1. Components/Composition
  • As the heading suggests any changes in components or composition of the formulation can be considered as major changes.
  • Such significant changes must be inspected carefully before execution as it can affect the dissolution profile of the product. Such changes require a “Prior Approval Supplement”.
  • Any change in components or its composition changes comes under SUPAC guidance.
  • The addition or deletion of an ingredient to be considered carefully can adversely affect the dissolution profile of the finished product and must be filed as a Prior Approval Supplement.
  • Few exceptions include addition or reduction in excipient – colors (removed/ reduced).
2. Site Change
  • As the heading suggests any changes in the site of manufacture can be considered as major changes. The sponsor who is responsible for ANDA filing - includes in its application the site of manufacture, where the drug product will be manufactured, tested, packaged, and/or labeled. Any change in any of these sites can adversely affect the formulation’s identity, strength, quality, purity, or potency of the finished product.
  • Such significant changes must be inspected carefully before execution and also should be in compliance with cGMP guidelines as any site change comes under SUPAC-IR.
  • An individual change which includes packaging operation site change, utilizing container (s)/ closure (s) in the approved application, such changes to be addressed as “Change Being Effected Supplement”.
3. Change in Batch Size
  • As the heading suggests change in batch size from lab-scale formula to giant-scale production batches tends to change the operating parameters which include such as mixing time and its speed etc., needs to be adjusted as per the size of the equipment.
  • Proper inspection and validation are required of the batches before the submission of the application.
  • Level 1 change can be defined as any change in the production batch.
  • Any change which falls outside the validation ranges, the change can be considered under SUPAC-IR and as a level 2 change.
4. Manufacturing
This includes any change made in equipment and the process used in manufacturing a drug product.

A) Equipment Change
  • As the heading suggests any change in manufacturing equipment other than that used in the approved application requires appropriate validation and proper inspection before implementation so that the new equipment is similar to the original equipment.
  • Equipment within the same class and subclass like change in the manufacturer of equipment are acceptable under the condition to have the same design and operating principle under SUPAC-IR. Eg: V-cone blender manufactured by different manufacturers can be responsible for any changes are acceptable
  • Any sort of change from one class of equipment to another would be considered a change in design and operating principle and would be considered different under SUPAC-IR. Eg: V-cone blender to ribbon blender
  • Any significant change in manufacturing equipment than that used in the initial approved application needs proper inspection and appropriate validation studies to demonstrate that the new equipment is similar to the original equipment.
  • Equipment that falls under the same class and subclass would be considered to have the same design and operating principle under SUPAC-IR. Eg: Change in diff mfr of V-cone blender-acceptable
  • Change from one class of equipment to another could bring up a change in design and operating principle and would be considered different under SUPAC-IR.
B. Process Change
  • As the heading suggests change in the manufacturing process or technology can have adverse effects on the identity, strength, quality, purity, or potency of a drug product.
  • The safety and effectiveness of the drug or product depending on the selection of the process of manufacturing or technology to be used should be properly validated.

5. Specifications
  • Specifications are the standards to be met by a drug product to ensure conformance of reproducibility, quality and consistency are maintained.
  • Such changes require a “Prior Approval Supplement” unless there is some exemption from Regulation guidance documents.
  • Prior approval is required on the following major changes in specification except as provided in the SUPAC-IR guidance as follow:
  1. Relaxing an acceptance criterion
  2. Deleting any part of a specification
  3. Changing or establishing a new regulatory analytical procedure that does not provide the same or increased assurance of the identity, strength, quality, purity, or potency of the material being tested as the analytical procedure described in the approved application.
  4. A 30 days Changes Being Effected Supplement needs to be filed in case of moderate changes in specifications, e.g.,
  5. a) Change in regulatory analytical procedures is identified as major.
    b) A change in analytical procedure or deletion of a test for raw materials used in drug substance manufacturing.
  6. Any changes in specifications which can cause detrimental side effects of a product but without interfering with the safety and effectiveness of the product can be submitted in an annual report.
6. Packaging
Packaging plays an important role as it can affect the shelf life of the finished product. Therefore, under the new guidance for industry, and the stability guidance, the requirements for packaging changes have been relaxed significantly.
Get subject wise printable pdf documentsView Here





Ankur Choudhary is India's first professional pharmaceutical blogger, author and founder of pharmaguideline.com, a widely-read pharmaceutical blog since 2008. Sign-up for the free email updates for your daily dose of pharmaceutical tips.
.moc.enilediugamrahp@ofni :liamENeed Help: Ask Question


1 comment: Post Yours! Read Comment Policy ▼

Please don't spam. Comments having links would not be published.


Popular Categories

QA SOPs QC SOPs Micro SOPs HVAC Production SOPs Stores SOPs Checklists Maintenance SOPs HPLC Sterile GLP Validation Protocols Water System GDP Regulatory Maintenance Calibration Warning Letters Education B.Pharmacy
Online Courses


Follow Pharmaguideline


DOCUMENTS

PHARMACEUTICAL DOCUMENTS




Editable Pharmaceutical Documents in MS-Word Format. Ready to use SOPs, Protocols, Master Plans, Manuals and more...

View


adsbypg


Recent Posts